|
Q: When changing out a panel with a main breaker and 25 branch circuits, would a contractor have to permit the 25 branch circuits?
A: No, unless branch circuits are added. Please see OAR 918-309-0040 (6), 918-309-0060.
(Tri-County Electrical Code Forum April 28, 2004)
|