Meter base parts replacement

Q. Is a permit required to replace "jaws" or parts of a meter base? Inspectors cannot inspect after a power company installs a meter.

A. Yes, please see ORS 479.5309(9), OAR 918-309-0040 (10), OAR 918-309-0220(1)c. A minor label can be used if a re-connect from the utility is not required.
(Tri-County Electrical Code Forum November 20, 2003)

   
   
 